Project-specific design
Capacity, pressure and connection requirements are planned together.

03A mobile LPG distribution tank integrating meter, pump and filling equipment, engineered to 17.5 bar design pressure and ASME / AD 2000 / ADR.
The product family, project scope and site conditions are evaluated together.
Capacity, pressure and connection requirements are planned together.
Body forming and welding processes follow the same discipline.
Pressure testing, quality control and pre-shipment preparation are completed.